Plans for New Old Homes

Construction Documents

During the Construction documents phase, The Bungalow Company will modify the technical drawings to reflect your design and incorporate the structural engineer’s work into the construction documents. At this point, the nearly completed plans will be issued and checked one more time by the structural engineer and returned to The Bungalow Company for a final quality control check and coordination.

Once The Bungalow Company has completed final review and is satisfied, we will call to verify the number of plan sets, shipping address, collect final payment, and package your plans to ship. Please note: the structural engineer’s final invoice will arrive separately and will be bound by their terms and conditions.

Building Code Information

The Bungalow Company Plans have been designed to conform to the Uniform Building Code (UBC), the International Residential Code (IRC), and the Oregon Residential Specialty Code (ORSC). Many states have modified the basic code for their region which may require modification for the plans to comply.

GETTING STARTEDDESIGN MODIFICATIONSPROPOSALDESIGN DEVELOPMENTCLIENT REVIEWSTRUCTURAL ENGINEERINGCONSTRUCTION DOCUMENTSFINAL PLANSONGOING SUPPORT
<>


 
©1998-2010 • THE BUNGALOW COMPANY • ALL RIGHTS RESERVED OUR POLICIES